Six-Week Clinic Website Build: What Happens and What You Need to Do

Short answer: A healthcare website redesign for a clinic commonly takes about six weeks: agree the basics first, then structure and design in weeks one and two, build and content in weeks three and four, testing in week five and launch in week six. Content approvals cause most delays, so gather service details, qualifications and photographs early, give feedback in one round from one person, and collect the old URL list in week one for redirects.
A new clinic needed a website, and the founders wanted to know what they were signing up for. How long would it take? What would they need to do? Where could it go wrong? A six-week build is common, and knowing what happens each week makes it far easier to plan.
Here is how a typical clinic website build unfolds, and what you can do to keep it on track. For the decisions to make before the build starts, see our step-by-step guide to how to make a medical website in the UK.
Before the build: agree the basics
A short discovery stage sets direction. You decide the audience, the services, the tone and the goals. You share any brand materials and examples of sites you like. The clearer this is, the fewer changes later. Do not skip it.
Weeks one and two: structure and design
The first weeks shape the site. The team maps pages and navigation, then designs the homepage and key templates. You review and give feedback. Try to gather your comments in one round, from one person, rather than in pieces. Conflicting feedback slows everything.
Clinic website build content: the part that takes longest
Words take time, and they usually cause the delays. Each service page needs clear, accurate text, ideally reviewed by a clinician. If your agency writes the drafts, your job is to review quickly and correct anything clinically wrong. Our SEO copywriting service covers this.
Weeks three and four: build and fill
Developers build the pages and add the content, images and forms. You will get a preview link to check. Read every page, on a phone as well as a computer. Note anything unclear, wrong or missing.
Real photographs matter
Real images of the clinic and team build trust. Plan a photo session early, because it can hold up the project. If the building is not ready, use simple portraits of the doctors for now and update later.
Week five: testing and fixes
The team tests forms, speed, mobile layout, links and tracking. You review corrections. This is also when SEO basics are checked: page titles, headings, links and technical settings. Our technical SEO checks are part of it.
Week six: launch
Launch is not the end. Before going live, make sure you have redirects for any old pages, a sitemap ready and tracking working. After launch, monitor for problems for a few days, and keep a list of small fixes for the first month.
What can delay a website build
The usual causes are late content approvals, several people giving conflicting feedback, missing images and last-minute changes to scope. Agree who approves what, set a deadline for feedback and keep a list of changes for after launch.
Prepare your content in advance
Start writing about your services early, even before design is final. Gather qualifications, service descriptions, prices and answers to common questions. Having content ready is the best way to keep a project on schedule, and it improves the quality of the final site.
Think about what happens after launch
A website needs care once it is live. Plan who will add articles, answer enquiries, review analytics and fix small issues. Agree a monthly rhythm. The first three months after launch usually matter more than the launch day itself.
Communicate with your future patients early
Even before the doors open, you can build interest. A simple holding page, a clear description of what is coming and a way to register interest help you collect early enquiries. Keep it honest about dates and services. Early communication turns launch day into a moment people have been waiting for.
Prepare your images and logos
Gather logos, portraits and clinic photographs in high quality before the build. Late or low-quality images are a common cause of delay. A shared folder with clear names saves time for everyone.
Plan your enquiry handling
Decide who receives form submissions, how quickly they reply and what they say. Test the process before launch. A great site loses value if enquiries sit unanswered.
Check accessibility and privacy
Make sure text is readable, images have descriptions and the site works with a keyboard. Add a clear privacy notice and cookie information. These basics protect patients and meet legal expectations.
Keep the scope clear
Agree exactly which pages, features and integrations are included, and put anything extra on a list for later. Clear scope prevents disagreements and delays. If something important is missing, discuss the cost and time openly before it is added.
Plan for growth after launch
A clinic website is never finished. Plan how you will add pages, publish articles and review results in the months after launch. A simple monthly routine keeps the site fresh and builds search visibility steadily.
Keep the launch calm
Choose a launch day when you are not rushed, and check every form, phone number and booking link. Tell your team when it goes live and what to do if patients report a problem. A quiet, well-checked launch is far better than a dramatic one, and you can announce the site more loudly once you know it works.
What the sources say
Several published requirements are easier to meet if they are planned in week one rather than week five. The CQC says providers must display their CQC rating on any website where they describe their service, no later than 21 calendar days after the rating is published; see how providers must display ratings. Agree who supplies the current rating and who updates it.
The ICO's cookies guidance says non-essential cookies cannot be set before the user has consented and that consent must be actively and clearly given. Decide which analytics and advertising tools will go live, and set up the consent banner before launch, not after.
Google's site move guidance advises mapping each old URL to its new equivalent, using permanent redirects and keeping them in place for generally at least one year. If the new site replaces an old one, collect the old page list in the first week. Google's web.dev guidance defines the three Core Web Vitals and their "good" thresholds as a Largest Contentful Paint of 2.5 seconds or less, an Interaction to Next Paint of 200 milliseconds or less and a Cumulative Layout Shift of 0.1 or less, assessed at the 75th percentile of page loads (see web.dev, Web Vitals).
The ICO also says that a hard-to-find privacy policy is not enough on its own to show consent. For a six-week build, that points to a short list of week one tasks: the rating, the cookie tools, the old URL list and a speed target to test against.
Your checklist
- Agree audience, services and tone at the start.
- Gather feedback in one round from one person.
- Review content quickly and check clinical accuracy.
- Arrange real photographs early.
- Test on a phone before approving.
- Plan post-launch fixes.
For the design stage, our healthcare website design service explains how a build is planned and reviewed. Feedback can slow a build, so our article on how to get revisions without chaos sets out a simple approach. If you are replacing an existing site rather than starting fresh, where to start when rebuilding a poor clinic website covers the first decisions.
Our companion article on a phased launch explains the wider plan. If you would like help, we are glad at Pulse Digital Health to talk.
Frequently asked questions
How long does a clinic website take to build?
Around six weeks is common for a focused site, but it depends on the number of pages and how quickly content is approved. Agree the timeline in writing at the start and set dates for content, feedback and approval. A written timeline avoids misunderstandings.
What do I need to provide for a website build?
Details of your services, clinical review of the text, photographs, brand materials and quick feedback. Prepare your text, photos, logos and logins early, since late materials are the most common cause of delay. Early materials prevent the most common delays.
What usually delays a website project?
Late approvals, conflicting feedback, missing photos and changes to scope part-way through. Set a feedback deadline and name a single approver, so comments arrive together and do not conflict. One approver keeps feedback consistent.
Who should write the content?
A specialist writer can draft it, and a clinician should review it for accuracy. Ask the writer to prepare drafts for each page and review them quickly, checking clinical accuracy. Fast review keeps the project moving.
What happens after launch?
The team monitors for issues and fixes small problems. You then add content and improve over time. Keep a list of small fixes for the first month after launch and work through them steadily. Steady fixes keep the site improving.
Can I change things after launch?
Yes. Keep a list of small changes for after launch so the project stays on schedule. Keep a list for the next round of updates, so the project stays on time and improvements are not lost. A running list makes the next update easier.
Do I need to show my CQC rating on a new clinic website?
The CQC says providers must display their rating on any website where they describe their service, no later than 21 calendar days after the rating is published. Ask your web team to leave a clearly labelled place for it, and agree in week one who will supply and update it.